DNWP0027- Lot 1B / WAGR B55 Demolition - Sellafield - A2R JV
This opportunity has closed.
- Buyer
- Altrad AtkinsRealis Joint Venture (A2R JV)
- Estimated value
- £5m
- Location
- UK
- Deadline
- 10 November 2026
- Published
- 26 October 2026
- Category
- Construction work for nuclear reactors
- Trade
- Building repairs and maintenance · Construction and civil works
- Suitable for SMEs
- Yes, flagged by the buyer
View the official notice on Contracts Finder
Description from the notice
The B55 and B55.2 demolition project at Sellafield involves the controlled demolition and dismantling of the B55 Office Complex and B55.2 Turbine Hall, located within the WAGR complex, down to existing ground-floor slab level. The scope includes soft stripping, asbestos remediation, high-reach mechanical demolition of the structural frame, cladding and reinforced-concrete floors, together with segregation and processing of demolition arisings, backfilling of voids and final site clearance. A key constraint is Substation 65, which is located within the B55/B55.2 structure and must remain operational and be protected from demolition impacts, dust and water ingress throughout the works. Retained basements and associated structures also require protection, while uncertainties associated with ageing structures, buried services, below-ground voids and incomplete historical information must be managed through robust surveys, demolition engineering and risk-informed planning. Overall, the project is intended to provide a safe, demolition-led solution that reduces workforce exposure, removes redundant infrastructure and supports accelerated hazard reduction across the wider WAGR decommissioning programme. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Only your trade and your region, each with a plain-English summary. How alerts will work